Figure 10 and Figure 11: Steel pipes loaded with a gap to the front and with inadequate tie-down lashing. Load securing would have been sufficient if friction-enhancing mats had been used. The upper layer of steel pipes was loaded in the cantline, so increasing the lateral pressure on the lower pipes. As a result, more load securing is necessary.
Figure 10 and Figure 11: Steel pipes loaded with a gap to the front and with inadequate tie-down lashing. Load securing would have been sufficient if friction-enhancing mats had been used. The upper layer of steel pipes was loaded in the cantline, so increasing the lateral pressure on the lower pipes. As a result, more load securing is necessary.